
LE2 and ME2 Litharge and Red Lead Furnaces
Highly energy efficient, electrically heated continuous tubular
reactors for processing a given raw oxide to a finished oxide
LE2: 4 – 6 tons/day of litharge (< 0.01% free Pb)
ME2: ca. 2 tons/day of red lead (50-75% Pb3O4)*
*production is indicative, depends both on final product quality required
as well as the specific properties of the raw oxide feed