LE2 and ME2 Litharge and Red Lead Furnaces

Highly energy efficient, electrically heated continuous tubular
reactors for processing a given raw oxide to a finished oxide

LE2:  4 – 6  tons/day of litharge (< 0.01% free Pb)
ME2:  ca. 2 tons/day of red lead  (50-75% Pb3O4)*

*production is indicative, depends both on final product quality required
as well as the specific properties of the raw oxide feed

Engineering Folder